PORTAL RASMI TENTERA LAUT DIRAJA MALAYSIA (TLDM)

Register Login

KD PAHANG (172)

KD PAHANG (172)

pahang

PATROL VESSEL

Name : KD PAHANG, No Penant : 172

Builders : Blohm + Voss/Penang Shipbuilding

Laid down : 21 Dec 2001

Launched : 02 Okt 2003

Commissioned : 03 Aug 2006

Displacement, tons : 1650 full load

Dimensions, feet(metres) : 298.9 x 39.4 x 9.8

Main machinery : 2 Caterpillar 3616 diesel,
                                total of 14617 hp(m)
                                (10.9 MW) sustained, 2 shafts,
                                cp propellors

Speed, Knots : 22. Range, n miles: 6050 at 12kt

ComplemenT : 68 (11 0fficers)

Radars : Air/surface search: TRS-3D/16ES; G-band.

Sonars : Fitted for.

Helicopters : Platform for medium helicopter.

Programmes : Following a delay of 19 months
                           since initial signature,
                           the Malaysian government, the
                           Penang Shipbuilding
                           Corporation and German Naval
                           Group comsortium
                           (led by Blohm + Voss) reached
                            final agreement in
                            November 2000 for the supply of
                            an initial batch of six vessels.
                            The first two OPVs were built in
                            Germany for Shipment to Malaysia
                            and assembly and fitting out at
                            Lumut. The first ship left
                            Hamburg on 1 April 2003 and the
                            second ship on 6 october 2003.
                            Subsequent ship under contruction
                            in Malaysia.However, the
                            programme has been plagued
                            technical problems and quality
                            control issues and, following
                            the reversion of PSC to state
                            control by September 2005, a new
                            management team was put in place.
                            The third and fourth units were
                            under consideration in late 2006
                            and work on the hulls of the
                            fifth and six units had started.
                            However, the conctruction
                            programme is speculative.

Structure : Design based on Blohm + Voss MEKO
                    100 including measures
                    to reduce the radar and IR
                    signatures.Space has been include
                    SSM, SAM, sonar and EW suite.

Operational : Principal tasks are expected to be
                         maritime surveilliance and patrol
                         duties in the Malaysians EEZ.
                         The first two are to be
                          based at Sepanggar.

Source : Jane's Fighting Ships

Paparan terbaik: Google Chrome/Internet Explorer 8.0 dengan resolusi skrin 1600x900.

Top Desktop version