PATROL VESSEL
Name : KD PAHANG, No Penant : 172
Builders : Blohm + Voss/Penang Shipbuilding
Laid down : 21 Dec 2001
Launched : 02 Okt 2003
Commissioned : 03 Aug 2006
Displacement, tons : 1650 full load
Dimensions, feet(metres) : 298.9 x 39.4 x 9.8
Main machinery : 2 Caterpillar 3616 diesel, total of 14617 hp(m) (10.9 MW) sustained, 2 shafts, cp propellors
Speed, Knots : 22. Range, n miles: 6050 at 12kt
ComplemenT : 68 (11 0fficers)
Radars : Air/surface search: TRS-3D/16ES; G-band.
Sonars : Fitted for.
Helicopters : Platform for medium helicopter.
Programmes : Following a delay of 19 months since initial signature, the Malaysian government, the Penang Shipbuilding Corporation and German Naval Group comsortium (led by Blohm + Voss) reached final agreement in November 2000 for the supply of an initial batch of six vessels. The first two OPVs were built in Germany for Shipment to Malaysia and assembly and fitting out at Lumut. The first ship left Hamburg on 1 April 2003 and the second ship on 6 october 2003. Subsequent ship under contruction in Malaysia.However, the programme has been plagued technical problems and quality control issues and, following the reversion of PSC to state control by September 2005, a new management team was put in place. The third and fourth units were under consideration in late 2006 and work on the hulls of the fifth and six units had started. However, the conctruction programme is speculative.
Structure : Design based on Blohm + Voss MEKO 100 including measures to reduce the radar and IR signatures.Space has been include SSM, SAM, sonar and EW suite.
Operational : Principal tasks are expected to be maritime surveilliance and patrol duties in the Malaysians EEZ. The first two are to be based at Sepanggar.
Source : Jane's Fighting Ships
|